| Shell Cost |
|
The total cost to build the basic structure of a building plus necessary utilities. The shell cost of a building is the total cost of a project minus the cost of tenant improvements.
Total Cost of Unit - Tenant Improvement Allowance = Shell Cost
A list of Necessary Utilities to be considered a completed shell: Water Sewer Electric Telephone Cable/DSL Internet Shells typically already have floor covering
|

